Team



José Ignacio   Aguirre Rodríguez 

 



Land use Modification NNSS PP8, PERI 2 i PP9


Alpicat, Lleida
N.E.:1506

 

Surface:              23.453m2            
Budget:               4,37 M Euros
Client:                 PLM Projectes i Serveis
Com. date:         2007


Tasks developed:

· Approval of a Modification of the general city plan

The modification increases the offer of two, three and four bedroom housing units with an average built floor area of 100m 2 (1,076 ft²) , and plans for a reserve of social housing units HPP over 70 m2 (753 ft²)  built up area, according to city demands. There is no additional built floor space and thus the FAR remains unchanged.

Given the Municipality need for a piece of land for the future City Hall building, the proposal defines accordingly a donation area for civic uses, included in the current polygon PP-8 i el PERI-2.