Special Plan new high voltage distribution line
Alcoletge, Benavent de Segrià, Torre-Serona, Torrefarrera, Lleida.
N.E.:1312
Surface: Total length of the line is 13.652 m
Urb. cost: 6,01 M Euros
Client: Electra Caldense,SA
Com. date: 2009-2010
Tasks developed:
The line stretch starts at Industrial area SUR-35 in Lleida and ends on the extension of the Industrial area “Les Comes” in Torrefarrera, crossing the municipal boundaries of Lleida, Alcoletge, Corbins, Torre-serona and Torrefarrera.
Considering the existing landscape and environmental values and assets on site and the typology of an electrical infraestructure, the project aims chiefly to regulate the use of the territory to allow its development and maintenance by the specific bylaw amendments included in the plan.
To achieve the goal the especial plan:
· Describes the basic technical characteristics of the line.
· Limits and regulates the admitted and non-conforming uses and other parameters within the plan area of intervention.