Team



José Ignacio   Aguirre Rodríguez  José Ignacio   Aguirre Rodríguez  

 

 



Urban Park at Son Fuster (*)


Son Fuster, Palma de Mallorca
N.E.: 8158

Surface:                        220.000 m2 (2,368,000 ft2)
Budget:                         20,20 M Euros
Client:                           Ajuntament de Palma
Com. date:                   2002


Tasks developed:

· Urban Master Plan

Feasibility study to provide the city of Palma with an extensive green corridor connecting center and periphery, integrating the existing infrastructures within a sustainable growth and the urban fabric of the neighborhood and the city.
Design and usage criteria are proposed for the development of the urban park, and also urbanization proposal and estimated budget. Proposal for the rehabilitation of the old traditional construction of Son Fuster.


(*) Commissioned to the company IDOM SA under the leadership of OM Arch.& Planning.